Phase 1: Eisenhower Lower Playground

Our primary goal is to raise enough funds by April 2022 for the Eisenhower Elementary Lower Playground revamp.

This project includes the addition of:

  • a large play structure with wheelchair accessible ramps

  • two oversized shade umbrellas

  • sensory music panels

  • Inclusive-Whirl (inclusive merry-go-round with wheelchair accessibility)

  • Rock n' Raft (inclusive boat with wheelchair accessibility)

  • new surfacing that allows access to all equipment on the playground and provides access for all

The total cost of this project is estimated to be $230,000.

Phase 2: Eisenhower Upper Playground

Our secondary goal is to raise enough funds by April 2023 for the Eisenhower Elementary Upper Playground revamp.

This project includes the addition of:

  • a large play structure with wheelchair accessible ramps

  • sensory music panels

  • Spinning sensory wave seats

  • Rox All See Saw (inclusive 4 seat see saw)

  • Sky Run Zip Track with 2 tracks (including one with adaptive seat)

  • Rock n' Raft (inclusive boat with wheelchair accessibility)

  • new surfacing that allows access to all equipment on the playground and provides access for all

The total cost of this project is estimated to be $250,000.